A sourcing manager sends a tech pack on a Monday. Here is what happens next, step by step, from pattern and sample to the finished run leaving Kağıthane.
Every production run in this factory starts the same way: with a document, not a machine. The tech pack tells us what you want to make, and the first days of a project are spent reading it properly. Measurements, seam types, trims, wash instructions, label placement. The questions we ask at this stage are the cheapest questions of the whole project.
Once the pack is clear, the pattern is drawn and a sample goes into work. From an approved pattern and a fabric decision, sampling takes about a week. The sample travels to you, comes back with comments, and the comments become the second sample or the green light.
What the factory needs from you
Three things decide how fast the first weeks move:
- A complete tech pack, with measurements for every size you plan to order.
- A fabric decision, or a short list we can source against.
- A target date, so the run can be planned backwards from delivery.
The questions we ask before cutting are the cheapest questions of the whole project. The expensive ones are the ones nobody asked.
Production planning, Köroğlu Tekstil
From approval to the cutting table
With the sample approved, fabric is ordered and inspected on arrival. The marker is prepared so the cloth is used with as little waste as the pattern allows, and cutting is planned as one uninterrupted job. From this point, production for a typical run takes four to six weeks from the approved sample, depending on quantity and construction.
Sewing is organised by operation, and every operator sees the approved sample before the line starts. Mid-line checks catch problems while they are still cheap to fix; the full measurement check comes at the end, on every piece that will carry your label.

The last metre
Pressing, final quality control and packing are the quiet end of the process, and the part your customer actually touches. Each trouser is measured against the spec sheet, pressed, and packed the way your warehouse asked for it. Then the run is booked onto a truck, and the next tech pack starts the cycle again.
If you are planning a first order, start with the tech pack. Send it over, and we will come back with the questions that make the rest of the project fast.